Saturday, September 19, 2009

Coming along

Well, the room renovation is coming along. It seems to be taking a long time however, we are only working on it about 3 days a week. We hope to have the new room painted by the end of the weekend so we can look for carpet next week. So far the round wall has been modified - it is weight bearing so could not be completely removed - the sub floor built, the french doors put in, the room has been textured, a door cut into the garage wall to access the back yard, and the lights have been bought. We still need to buy baseboards and crown molding, carpet, tv, install lights and complete the finish work on the kitchen side of the round wall (mud/sand/texture/paint). I would love to have it all finished in the next 3 weeks. I am getting tired of all of the dust and really want my kitchen table back. After the room is finished our contractor will get the table top finished for the pool table/dining table conversion.

No comments:

Post a Comment

Note: Only a member of this blog may post a comment.